Snake River Sporting Club, a first-class golf and sporting community on 554 acres along the Snake River in Jackson Hole, Wyoming, required an environmentally-sound, optimal performing onsite wastewater treatment system which would preserve the natural habitat and support its various amenities.
Project Snapshot
System Specifications: Community soil absorption system
Infiltrator Products Used:
- 37,000 square feet of Quick4 Standard Chambers
- 624 Quick4 Standard MultiPort end caps
Flow: 45,000 GPD
Soil Type: Perc rate of 10 min/inch
Distribution Type: 1 ¼" to 4" pressurized HDPE