Years of use and an old, leaking tank that had infiltration issues adding to the outflow to the drainfield. Limited space and depth to a seasonally-high water table of 36” at grade. Limited areas of non-compacted soils impacted the available footrprint of a replacement system and eliminated the use of a traditional mound with stone.
Project Snapshot
System Specifications: 450-gallon per day Advanced Enviro-Septic (AES) system with treatment area of 12’ x 32' and new septic tank
Infiltrator Products Used:
Advanced Enviro- Septic (AES)
Combined Treatment and Dispersal System