As a component of the Missouri Department of Health and Senior Services (DHSS) product approval process, a field performance assessment of 30 Advanced Enviro-Septic (AES) bed systems was initiated to demonstrate acceptable long-term hydraulic performance. AES systems were installed within three geographic areas of Missouri: Kansas City, St. Louis, and southwest Missouri/Branson. Installation sites included a diversity of soil textures and site slopes, along with daily wastewater flow volume. All systems had been operational for between three and eight years. One system was installed on a commercial property, with the remaining 29 serving single-family residences.
Project Snapshot
Field Performance Assessment of Advanced Enviro-Septic Systems Installed in Missouri
Infiltrator Products Used:
Advanced Enviro-Septic Systems
Download the Full Case Study ›