Faced with a failing residential septic system that was more than 40 years old, limited space, and ground water at only 4’ from the surface grade a Goddard, Kansas homeowner turned to Tim Wagner, Water Quality Specialist for Sedgewick County, Kansas for help. Wagner decided to use the system repair as a demonstration installation for the health department and approximately 15 area contractors who attended to learn about system design, installation, and maintenance of an LPP system using EZflow.
Project Snapshot
System Specifications: 450 GPD Single Family LPP system with STEP tank
Infiltrator Products Used: EZflow by Infiltrator
Download the Full Case Study ›