Yogi Bear’s Jellystone Park in Waller, Texas is a popular full-service campground and recreation center featuring cabins, tent sites, RV camping, swimming pools and a lazy river, and two food service venues. The park’s existing sewage treatment system was at capacity, restricting park service expansion and requiring costly and time consuming maintenance. Weishuhn Engineering was charged with designing a new system that could handle the wastewater flow of 30,000 gallons per day (GPD) from all park facilities.
Project Snapshot
System Specifications: 30,000 GPD Package Treatment Plant for full-service campground and recreational center.
Infiltrator Products Used: Package Treatment Plant
Download the Full Case Study ›