The aging system did not have the prep and coating methods for above ground steel tanks that we have today. The plant had completed a full life cycle and was rusted beyond repair with several patches. With the tank nearing the end of its expected life cycle due to rust resulting from outdated prep and coating methods, park staff knew they needed a new replacement system. Because the park was happy with the existing system and its longevity, they contracted Infiltrator to fabricate a new Extended Aeration Package Plant replacement system that would be easy for the team to transition to due to familiarity with the previous model.
Project Snapshot
3,000 GPD wastewater treatment system for community park
Infiltrator Products Used:
Package Sewage Treatment Plant