Infiltrator was faced with the challenge of manufacturing a treatment system that would maintain the footprint boundaries of the existing system, while providing treatment with more stringent effluent quality requirements. Additionally, given the location and importance of aesthetics in this highly traveled vacation area, the owners wanted the system tucked away and virtually unnoticeable by the residents of the resort.
Project Snapshot
Design flow of 21,000 Gallon Per Day Extended Aeration system
Infiltrator Products Used:
Flow Equalization Chamber Sludge Chamber
Aeration Chamber
Clarifier Chamber
Chlorine Contact