Case Studies
ECOPOD Advanced Wastewater Treatment Plant Brings Missouri Recovery Center into Compliance with State Regulations
Sana Lake Recovery Center is an addiction treatment center located in Dittmer, MO. When the facility purchased the property they were unaware that the existing single-cell lagoon was not approved or even permitted through the State of Missouri and operating a business on the property placed them in violation of the Missouri Clean Water Law. Additionally, the existing system was undersized and created pollution concerns. The facility eventually signed an administrative order to have a new system installed and operational by November, 2022.
ENVIRO-AIRE Package Wastewater Treatment Plant Installed at Fredericksburg, TX, Destination Brewery
An authentic Old World German-style destination bewery in Fredericksburg, TX, opened to the public in the fall of 2019. The 100-acre site features a fine dining restaurant, biergarten, and private event space. As the brewery expanded from a production-only facility to a destination brewery they needed a wastewater treatment system capable of meeting the expected growing demands of the property.